What was found
DURING SCHEDULED 12Y CHECK, FOUND CREASE BEAM CORRODED AT BS 947.5, RBL 52. REPAIRED BEAM PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 12Y CHECK, FOUND CREASE BEAM CORRODED AT BS 947.5, RBL 52. REPAIRED BEAM PER SRM.