What was found
DURING SCHEDULED SPV CHECK, FOUND RT CREASE BEAM WEB CORRODED AT BS 375. REPAIRED BEAM PER SRM AND BAC DWG.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED SPV CHECK, FOUND RT CREASE BEAM WEB CORRODED AT BS 375. REPAIRED BEAM PER SRM AND BAC DWG.