What was found
DURING SCHEDULED 16Y CHECK, FOUND FRAME CORRODED AT BS 794.3, BETWEEN STR 24R TO STR 25R. REMOVED AND REPLACED FRAME PER SRM AND BAC DWG.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 16Y CHECK, FOUND FRAME CORRODED AT BS 794.3, BETWEEN STR 24R TO STR 25R. REMOVED AND REPLACED FRAME PER SRM AND BAC DWG.