What was found
DURING SCHEDULED 24Y CHECK, FOUND NR 4 L/E SLAT DELAMINATED AT T/E. REPAIRED SLAT PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 24Y CHECK, FOUND NR 4 L/E SLAT DELAMINATED AT T/E. REPAIRED SLAT PER SRM.