What was found
DURING SCHEDULED SPV CHECK, FOUND FUSELAGE FRAME SHEAR TIE CORRODED AT BS 867, STR 27L TO STR 27R. REMOVED AND REPLACED SHEAR TIE PER SRM AND SWA EA.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED SPV CHECK, FOUND FUSELAGE FRAME SHEAR TIE CORRODED AT BS 867, STR 27L TO STR 27R. REMOVED AND REPLACED SHEAR TIE PER SRM AND SWA EA.