What was found
DURING SCHEDULED 18Y CHECK, FOUND SHEAR TIE CORRODED AT BS 500A, BETWEEN STR 27R TO STR 28R. REMOVED AND REPLACED SHEAR TIE PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 18Y CHECK, FOUND SHEAR TIE CORRODED AT BS 500A, BETWEEN STR 27R TO STR 28R. REMOVED AND REPLACED SHEAR TIE PER SRM.