What was found
DURING SCHEDULED 24Y CHECK, FOUND SHEAR TIE CRACKED AT BS 500D, STR 13R. REMOVED AND REPLACED SHEAR TIE PER SRM AND BAC DWG.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 24Y CHECK, FOUND SHEAR TIE CRACKED AT BS 500D, STR 13R. REMOVED AND REPLACED SHEAR TIE PER SRM AND BAC DWG.