What was found
DURING SCHEDULED 24Y CHECK, FOUND CREASE BEAM WEB CRACKED BETWEEN BS 907 TO BS 927, STR 17L. REMOVED AND REPLACED WEB PER SRM AND BAC DWG.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 24Y CHECK, FOUND CREASE BEAM WEB CRACKED BETWEEN BS 907 TO BS 927, STR 17L. REMOVED AND REPLACED WEB PER SRM AND BAC DWG.