What was found
DURING SCHEDULED 26Y CHECK, FOUND CORROSION AFT PIT SHEAR TIE BILGE AREA STA 747, RBL 7. REPAIRED PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 26Y CHECK, FOUND CORROSION AFT PIT SHEAR TIE BILGE AREA STA 747, RBL 7. REPAIRED PER SRM.