What was found
DURING SCHEDULED SPV CHECK, FOUND RT CREASE BEAM CRACKED AT BS 616. REMOVED AND REPLACED BEAM PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED SPV CHECK, FOUND RT CREASE BEAM CRACKED AT BS 616. REMOVED AND REPLACED BEAM PER SRM.