What was found
DURING SCHEDULED SPV CHECK, FOUND FRAME CORRODED AT BS 809, LBL 5. REPAIRED FRAME PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED SPV CHECK, FOUND FRAME CORRODED AT BS 809, LBL 5. REPAIRED FRAME PER SRM.