What was found
DURING SCHEDULED 22Y CHECK FOUND, R1 DOOR CUTOUT FWD FRAME CRACKED AT BS 294.5+6, BETWEEN STR 17R TO STR 16R. REPAIRED FRAME IAW SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 22Y CHECK FOUND, R1 DOOR CUTOUT FWD FRAME CRACKED AT BS 294.5+6, BETWEEN STR 17R TO STR 16R. REPAIRED FRAME IAW SRM.