What was found
DURING SCHEDULED SPV CHECK, FOUND RT CREASE BEAM CHORD CRACKED AT BS 639, RBL 65. REPAIRED BEAM PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED SPV CHECK, FOUND RT CREASE BEAM CHORD CRACKED AT BS 639, RBL 65. REPAIRED BEAM PER SRM.