What was found
DURING SCHEDULED 22Y CHECK, FOUND SHEAR TIE CORRODED AT BS 482A, BETWEEN STR 28R TO STR 28L. REMOVED AND REPLACED FRAME PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 22Y CHECK, FOUND SHEAR TIE CORRODED AT BS 482A, BETWEEN STR 28R TO STR 28L. REMOVED AND REPLACED FRAME PER SRM.