What was found
DURING SCHEDULED 24Y CHECK, FOUND RT CREASE BEAM WEB CORRODED BETWEEN BS 500A TO BS 500B. REPAIRED WEB IAW SRM AND DWG.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 24Y CHECK, FOUND RT CREASE BEAM WEB CORRODED BETWEEN BS 500A TO BS 500B. REPAIRED WEB IAW SRM AND DWG.