What was found
DURING SCHEDULED 16Y CHECK, FOUND CREASE BEAM "L" CHANNEL STIFFENER CORRODED AT BS 380+14, STR 17R. STIFFENER REPAIRED IAW SRM AND DWG.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 16Y CHECK, FOUND CREASE BEAM "L" CHANNEL STIFFENER CORRODED AT BS 380+14, STR 17R. STIFFENER REPAIRED IAW SRM AND DWG.