What was found
DURING SCHEDULED SPV CHECK, FOUND STUB BEAM CRACKED AT BS 616, RBL 63.5. REMOVED AND REPLACED BEAM IAW EA AND ER.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED SPV CHECK, FOUND STUB BEAM CRACKED AT BS 616, RBL 63.5. REMOVED AND REPLACED BEAM IAW EA AND ER.