What was found
DURING SCHEDULED 26Y CHECK, FOUND STRINGER CORRODED BETWEEN BS 747 TO BS 787, STR 26L. REPAIRED STRINGER PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 26Y CHECK, FOUND STRINGER CORRODED BETWEEN BS 747 TO BS 787, STR 26L. REPAIRED STRINGER PER SRM.