What was found
DURING SCHEDULED 26Y CHECK, FOUND SHEAR TIE CORRODED AT BS 747, BETWEEN STR 27R TO STR 26L. REMOVED AND REPLACED SHEAR TIE PER SRM AND DWG.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 26Y CHECK, FOUND SHEAR TIE CORRODED AT BS 747, BETWEEN STR 27R TO STR 26L. REMOVED AND REPLACED SHEAR TIE PER SRM AND DWG.