What was found
FLOOR STRUCTURE CHANNEL CRACKED AT BS 540, BETWEEN BL 0 AND RBL 24.5. R & R CHANNEL IAW SRM AND DWG.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
FLOOR STRUCTURE CHANNEL CRACKED AT BS 540, BETWEEN BL 0 AND RBL 24.5. R & R CHANNEL IAW SRM AND DWG.