What was found
SHEAR TIE CORRODED AT BS 500C, BETWEEN LBL 2 TO LBL 4. REPAIRED SHEAR TIE PER ER AND SWA EA.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
SHEAR TIE CORRODED AT BS 500C, BETWEEN LBL 2 TO LBL 4. REPAIRED SHEAR TIE PER ER AND SWA EA.