What was found
DOUBLER CORRODED AT LONGERON 30 EACH SIDE OF VERTICAL STIFFENER. REPAIRED DOUBLER IAW SRM & DWG.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DOUBLER CORRODED AT LONGERON 30 EACH SIDE OF VERTICAL STIFFENER. REPAIRED DOUBLER IAW SRM & DWG.