What was found
AFT PIT SHEAR TIE CORRODED AT BS 727E, BETWEEN BL 0 - RBL 6. REPAIRED SHEAR TIE IAW SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
AFT PIT SHEAR TIE CORRODED AT BS 727E, BETWEEN BL 0 - RBL 6. REPAIRED SHEAR TIE IAW SRM.