What was found
L/H HORIZONTAL STAB RIB AT STAB STA. 92.70 4TH STIFFENER FROM FWD END IS CRACKED REPAIRED L/H HORIZONTAL STAB RIB AT STAB STA 92.70 4TH STIFFNER FROM FWD END PER SRM 55-10-09-2R-4
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
L/H HORIZONTAL STAB RIB AT STAB STA. 92.70 4TH STIFFENER FROM FWD END IS CRACKED REPAIRED L/H HORIZONTAL STAB RIB AT STAB STA 92.70 4TH STIFFNER FROM FWD END PER SRM 55-10-09-2R-4