What was found
LT HORIZONTAL STAB HAS RIB STIFFENER CRACKED AT 129.5 (RIB 5) AT SECOND VERTICAL STIFFENER. REPAIRED RIB PER SRM 55-10-09-2R-4. SEE WIP'S AND SUB TASK FOR WORK ACCOMPLISHED
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
LT HORIZONTAL STAB HAS RIB STIFFENER CRACKED AT 129.5 (RIB 5) AT SECOND VERTICAL STIFFENER. REPAIRED RIB PER SRM 55-10-09-2R-4. SEE WIP'S AND SUB TASK FOR WORK ACCOMPLISHED