What was found
RT HORIZONTAL STAB HAS RIB STIFFENER CRACKED AT 120.3 (RIB 4) AT 3RD VERTICAL STIFFENER. REPAIRED RIB PER SRM 55-10-09-2R-4. SEE WIP'S AND SUB TASK FOR WORK ACCOMPLISHED.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
RT HORIZONTAL STAB HAS RIB STIFFENER CRACKED AT 120.3 (RIB 4) AT 3RD VERTICAL STIFFENER. REPAIRED RIB PER SRM 55-10-09-2R-4. SEE WIP'S AND SUB TASK FOR WORK ACCOMPLISHED.