What was found
LT MLG WHEEL WELL BULKHEAD VAPOR BARRIER CRACKED 14 INCHES LONG STARTING AT LBL 30, 3 IN FROM TOP TO LBL 34. PERFORMED INTERIM REPAIR TO LT MLG WHEEL WELL FWD BULKHEAD VAPOR BARRIER CRACK, PER SRM 57-10-10-1A-2 & 20-157-00471. PERFORM INSPECTION OF REPAIR AREA AT 1200 FLT CYCLE INTERVALS OR MORE FREQUENTLY. IF CRACK HAS GROWN PAST THE INTERIM SEAL, REF TO PARAGRAPH 4. ALLOWABLE DAMAGE 2 FOR ALLOWABLE DAMAGE LIMITS. REPETITIVE ACTION REQUIRED: PERFORM INSPECTION OF REPAIR AREA AT 1200 FLT CYCLES INTERVALS OR MORE FREQUENTLY. IF CRACK HAS GROWN PAST THE INTERIM REPAIR, REF TO PARAGRAPH 4. ALLOWABLE DAMAGE 2 FOR ALLOWABLE LIMITS.