As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
CENTER WING REAR SPAR VAPOR BARRIER WEB HAS AN 11.5' CRACK JUST INBOARD AND BELOW THE HYDRAULIC MODULAR PACKAGE ASSEMBLY AT LBL 39. ACCOMPLISHED INTERIM REPAIR, IAW SRM 57-10-10-1A-2 AND AFB SRM SUPPLMENT DOCUMENT NR AP 37.7-0602; 57-10-10 ALLOWABLE DAMAGE 2 FACT AS A RESULT OF POST REPAIR INSPECTION.