What was found
***CORROSION*** ON INTERCOSTAL AT AFT CARGO BAY BS807 RBL6 WL153. ; / APPLIED CHEMICAL CONVERSION COAT AND PRIMED TO FABRICATED PART I.A.W BOEING DWG 146A8132.OK TO INSTALL;CERTIFIED FOR STEP 3;INSTALLED NEW INTERCOSTAL BS 807-827; RBL 6; WL 153 IAW SRM 51-40-02-0G-0; DWG# 146A8130;RECEIVED INTERCOSTAL FROM FAB ON P.O #824835-SWA VERIFIED HEAT TREAT PER BAC5602 ON P;O #824835-SWA AND VERIFIED FAB PER DWG 146A8132-3 ON P.O #824835-SWA;REMOVED INTERCOSTAL BS 807-827; RBL6; WL 153 PER SRM 51-40-02-0G-0.;VERIFIED MEASUREMENT TABLE; INTERCOSTAL FOUND TO BE OUT OF LIMITS AND REPLACEMENT PART PER SRM 51-10-02-0G;EVALUATED CORROSION ON INTERCOSTAL BS807 RBL6 WL153 FOUND TO BE OUT OF LIMITS DUE TO NO ALLOWABLE LIMITS IN THE SRM AND REQUIRES REPLACEMENT PER SRM 51-10-0G-0;LOCATED AND DRILLED NEW INTERCOSTAL AT ACB BS807 RBL6 WL153 I.A.W BOEING DWG 146A8130 AND SRM 51-40-05;UPDATED MEASUREMENT TABLE;UPDATED SRM REFERENCE TO 51-10-02-0G-0 IN CORRECTIVE ACTION 2;VERIFIED INSTALLATION OF NEW INTERCOSTAL BS 807-827; RBL 6; WL 153 IAW SRM 51-40-02-0G-0; DWG# 146A8130;VERIFIED STEPS 6;7; AND 8 OK TO INSTALL