Service difficulty report · Cargo Track · Boeing 7377H4

Difficulty date
May 12, 2021
Submitted
June 16, 2021
Operation
Air carrier
Aircraft
N732SW
Make and model
Boeing 7377H4
Aircraft serial
27864
Aircraft time
74,727 hours, 43,976 cycles
Part
Cargo Track
Condition
Corroded
Location
Bs 727d Lbl 3
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CORROSION ON RAIL AT AFT CARGO BAY BS727D+6 LBL3 WL156. ; / APPLIED CHEMICAL CONVERSION COATING AND PRIMERED REPAIR PARTS @ BS 727D+6 LBL3 WL156 IAW SRM 53-00-53-2-2R.;ET INSPECTED CUT EDGE IAW 737 NDTM PART 6 51-00-00 PROCEDURE 23; NO CRACKS NOTED.<BR><BR>CAL ID IS000450 N500D;INSTALLED REPAIR PARTS IN ACB BS727D+6 LBL3 WL156 IAW SRM 53-00-53-2R-2.;LOCATED; DRILLED; TRIMMED AND DEBURRED NEW REPAIR PARTS @ BS 727D+6 LBL3 WL156 IAW SRM 53-00-53-2R-2.;OK TO INSTALL REPAIR PARTS @ BS 727D+6 LBL3 WL156.;REMOVED CORROSION ON RAIL AT AFT CARGO BAY BS727D+6 LBL3 WL156 IN A 2'X.90' AREA; ORIGINAL THICKNESS .063; REMAINING THICKNESS .053; FOUND TO BE OUT OF LIMITS IAW SRM 53-00-53-1A-2 PARA 4(A) 2 FIG.103 DEPTH GAGE ID ATS2473 S/N UNKNOWN; USED FOR MEASUREMENT;REMOVED RAIL UPPER JOGGLE IN A 3.1' AREA IN AFT CARGO BAY BS727D+6 LBL3 WL156 IAW SRM 53-00-53-2R-2;VERIFIED NDT WAS PREFORMED;VERIFIED DAMAGE REMOVAL PER SRM;VERIFIED FASTENER INSTALLATION;VERIFIED OK TO INSTALL NEW REPAIR PARTS;COMPLETE;EVALUATION AND ASSESSMENT CONFIRMED;VERIFIED; APPLIED CHEMICAL CONVERSION COATING AND PRIMERED REPAIR PARTS @ BS 727D+6 LBL3 WL156 IAW SRM 53-00-53-2-2R.;VERIFIED; LOCATED; DRILLED; TRIMMED AND DEBURRED NEW REPAIR PARTS @ BS 727D+6 LBL3 WL156 IAW SRM 53-00-53-2R-2.

More about the Boeing 737-7H4