Service difficulty report · Intercostal · Boeing 7377H4

Difficulty date
May 12, 2021
Submitted
June 16, 2021
Operation
Air carrier
Aircraft
N732SW
Make and model
Boeing 7377H4
Aircraft serial
27864
Aircraft time
74,727 hours, 43,976 cycles
Part
Intercostal
Condition
Corroded
Location
Bs 727a Rbl 3
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

***CORROSION*** ON INTERCOSTAL AT AFT CARGO BAY BS727A+18 RBL3 WL150 ; / INSTALLED NEW INTERCOSTAL IN ACB BS727A+18 RBL3 WL150 IAW SRM 51-40-02 AND DWG #146A7510.;LOCATED; DRILLED; DEBURRED; AND APPLIED CHEMICAL CONVERSION COATING IAW SRM 51-40-05 AND DWG #146A7510.;PRIMERED NEW INTERCOSTAL @ BS727A+18 RBL3 WL150 IAW SRM 51-20-01-0G-0. OK TO INSTALL.;RECEIVED NEW INTERCOSTAL FOR ACB BS727A+18 RBL3 WL150 FROM OSS PO#824713-SWA.;REMOVED INTERCOSTAL IN ACB BS727A+18 RBL3 WL150 IAW SRM 51-40-02.;VERIFIED MEASUREMENT TABLE; INTERCOSTAL FOUND TO BE OUT OF LIMITS AND REPLACEMENT PART PER SRM 51-10-02-0G;EVALUATED CORROSION ON INTERCOSTAL BS727A+18 RBL3 WL150 FOUND TO BE OUT OF LIMITS DUE TO NO ALLOWABLE LIMITS IN THE SRM AND REQUIRES REPLACEMENT PER SRM 51-10-02-0G-0;UPDATED MEASUREMENT TABLE;VERIFIED RECEIVED NEW INTERCOSTAL FOR ACB BS727A+18 RBL3 WL150 FROM OSS PO#824713-SWA. AND VERIFIED LOCATED; DRILLED; DEBURRED; AND APPLIED CHEMICAL CONVERSION COATING IAW SRM 51-40-05 AND DWG #146A7510. VERIFIED APPLICATION OF PRIMER AND OK TO INSTALL;VERIFIED INSTALL OF NEW INTERCOSTAL IN ACB BS727A+18 RBL3 WL150 IAW SRM 51-40-02 AND DWG #146A7510.

More about the Boeing 737-7H4