What was found
CORROSION ON ACB FLOOR-TO-SIDEWALL SUPPORT WEB; BS 847-856; RBL 22; WL 160 ; / APPLIED A CHEMICAL CONVERSION COATING IAW SRM 51-20-01-0G-0 AND PRIMED NEW WEB IAW SOPM 20-41-02 AND DWG 146A8322; OK TO INSTALL;BLENDED CORROSION ON ACB FLOOR TO SIDEWALL SUPPORT WEB BS 847-856; RBL 22; WL 160. BLENDED 1'X1'X.020'; ORIGINAL THICKNESS IS .063'. FOUND TO BE OUT OF LIMITS IAW SRM 53-60-15-1A-1.;EDITED MEASUREMENT TABLE;INSTALLED ACB FLOOR TO SIDEWALL SUPPORT WEB BS847 - BS856; RBL22; WL160 IAW SRM 51-40-02-0G-0 AND DWG 146A8321;LOCATED AND DRILLED NEW ACB FLOOR TO SIDEWALL SUPPORT WEB AT BS847 - BS856; RBL22; WL160 IAW SRM 51-40-05-0G-0 AND DWG 146A8321;OK TO INSTALL.;RECEIVED WEB IN FROM O.S.S; VERIFIED HEAT TREAT PER BAC5602 ON PO# 826173-SWA AND VERIFIED FABRICATION PER DWG 146A8322-12 ON PO# 826173-SWA;REMOVED SUPPORT WEB FROM BS 847-856; RBL 22; WL 160 IAW SRM 51-40-02-0G-0.