What was found
CORROSION Z CHANNEL R/H STA 727B TO 767 WITH CORROSION ; / CERTIFIED CORROSION WAS REMOVED FROM R/H Z CHANNEL BETWEEN STA. 727B TO STA. 767;EVALUATED AREA: ORIGINAL MATERIAL 0.040'. MATERIAL REMOVED 0.010'. MATERIAL REMAINING 0.030' FOUND OUT OF LIMITS IAW 53-00-53-1A-2.;FINAL INSPECTION; CORROSION REMOVAL; MATERIAL REMOVAL; Z CHANNEL REMOVAL; REPLACEMENT LOCATED AND DRILLED AND FINAL INSTALLATION OF CHANNEL WILL BE ACCOMPLISHED ON ITEM #TTG8Q004F476.;LOCATED AND DRILLED NEW Z CHANNEL ANGLE IAW SRM 51-40-05-0G-0 AND DWG#146A7502.;PERFORMED UT THICKNESS INSP AT REWORKED AREA IAW B737 NDT P4 51-00-00 PROC.3 ; MIN THICKNESS NOTED 0.030'<BR>TOOL USED: OLYMPUS 27MG BC:172139;REMOVAL OF Z CHANNEL R/H STA 727B TO 767 WAS ACCOMPLISHED ON CUSTOMER CARD #TTG8Q004F476;REMOVED CORROSION Z CHANNEL R/H STA 727B TO 767 LAW B 737-700 SRM 51-10-02-0G-0;REMOVED CORROSION AT Z CHANNEL R/H STA 727B TO 767. EVALUATED AREA: ORIGINAL MATERIAL 0.040'. MATERIAL REMOVED 0.010'. MATERIAL REMAINING 0.030' FOUND OUT OF LIMITS IAW 53-00-53-1A-2.