Service difficulty report · Angle · Boeing 7377H4

Difficulty date
May 13, 2021
Submitted
June 17, 2021
Operation
Air carrier
Aircraft
N416WN
Make and model
Boeing 7377H4
Aircraft serial
32453
Aircraft time
65,393 hours, 38,534 cycles
Part
Angle
Condition
Chafed
Location
Vertical To Fuse
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

LT FWD BS 1008 - 1016 FUSELAGE FIN TO BODY INTERFACE CLOSURE ANGLE HAS CHAFED AREAS. 8-28 ; / CERTIFIED (RII) STEPS #8; #9 AND #10 INSPECTED.;CERTIFIED LT CLOSURE ANGLE INSTALLATION AND 100% FASTENERS INSTALLATION BY SQUEEZE OUT TIME; INSPECTED.;FINAL INSPECTION: LT FWD CLOSURE ANGLE REMOVED AND REPLACED; COMPLETED.;INSTALLED CLOSURE ANGLE AT LT FWD BS 1008 - 1016 FUSELAGE FIN TO BODY INTERFACE PER B737-700 SRM 51-40-02-0G-0 AND DWG 147A0030;LOCATED AND DRILLED NEW ANGLE AT LT FWD BS 1008 - 1016 FUSELAGE FIN TO BODY INTERFACE CLOSURE PER B737-700 SRM 51-40-05-0G-0;MIXED 0870B002BM654SK SEALANT AT 1830 05/20/21 SQUEEZE OUT TIME BY 2030 05/20/21.;OK TO INSTALL NEW LH CLOSURE ANGLE.;OK TO TREAT AND PRIME DRILL HOLES.;REMOVED AND REPLACED CLOSURE ANGLE AT LT FWD BS 1008 - 1016 FUSELAGE FIN TO BODY INTERFACE PER B737-700 SRM 51-40-0-0G-0 AND DWG 147A0030;REMOVED ANGLE AT LT FWD BS 1008 - 1016 FUSELAGE FIN TO BODY INTERFACE CLOSURE PER B737-700 SRM 51-40-02-0G-0;TREATED AND PRIMED DRILLED HOLES ON ANGLE PER B737-700 SRM 51-20-01-0G-0;VERIFIED LT FWD FUSELAGE FIN BS 1008 TO BS 1016 CLOSURE ANGLE REMOVAL (STEP 1).;VERIFIED TREAT AND PRIME; INSPECTED.;VERIFIED AND INSPECTED LOCATED AND DRILL NEW HOLES.

More about the Boeing 737-7H4