What was found
FWD CARGO COMPARTMENT FLOOR STRUCTURE ZEE CHANNEL CLIP AT RBL21.00 AND STA 400 CRACKED ; / OK TO TREAT AND PRIME NEW HOLE'S;INSTALLED NEW CLIP AS PER B737-700 ARM 51-40-02-0G-0;LOCATED AND DRILLED NEW CLIP AS PER B737-700 ARM 51-40-05-0G-0;REMOVED AND REPLACED CLIP AT FWD CARGO COMPARTMENT FLOOR STRUCTURE ZEE CHANNEL AT RBL 21.00 AND STA 400 AS PER B737-700 ARM 51-40-02-0G-0 AND DRAWING # 143A7505;REMOVED CLIP AS PER B737-700 ARM 51-40-02-OG-0;TREATED AND PRIMED NEW CLIP AS PER B737-700 ARM 51-20-01-0G-0;VERIFIED TREAT AND PRIME ; OK TO INSTALL NEW CLIP;VERIFIED ACCOMPLISHMENTS OF STEPS 6AND 7