Service difficulty report · Support Channel · Boeing 7377H4

Difficulty date
May 17, 2021
Submitted
June 30, 2021
Operation
Air carrier
Aircraft
N400WN
Make and model
Boeing 7377H4
Aircraft serial
27891
Aircraft time
66,325 hours, 39,077 cycles
Part
Support Channel
Condition
Corroded
Location
Bs 727a-847 S25l
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

AFT CARGO FLOOR SUPPORT 'Z' CHANNEL IS CORRODED AT 727A TO 847 S25L DOT # 3 ; / [01] REMOVED CORROSION AT Z CHANNEL STA 727A TO 847 S25 L PER REF B 737 - 700 SRM 51-10-02-0G-0; [02] JOB CERTIFIED; [03] VERIFIED REMOVAL CORROSION AT Z CHANNEL ; PENDING NDT; [04] PERFORMED UT THICKNESS INSP AT REWORKED AREA IAW B737 NDT P4 51-00-00 PROC.3; MIN THICKNESS NOTED 0.025'<BR>TOOL USED OLYMPUS 27MG BC:172139; [05] EVALUATE REWORKED AREA: ORIGINAL THICKNESS .040'; MATERIAL LOST .015'; MATERIAL REMAINING .025'. FOUND OUT OF LIMIT AS PER REF B737-700 SRM 53-00-53-1A-2; [06] VERIFIED MATERIAL LOSS IN REWORK AREA PER SRM 53-00-53. FABRICATION REQUIRED; [07] LOCATED; DRILLED AND FABRICATED AFT CARGO FLOOR 'Z' CHANEL AT STA 727A TO 847 S25L AS PER REF B737-700 SRM 51-40-05-0G-0; [08] VERIFIED. JOB ACCOMPLISHED. OK TO TREAT AND PRIMER; [09] TREADED AND PRIMED AFT CARGO FLOOR SUPPORT Z CHANEL AS PER REF B737-700 AMM 51-21-41-370-801; [10] VERIFIED TREAT AND PRIMER ;OK TO INSTALL NUTPLATE AND ANGLES; [11] ACCOMPLISHED CHART; [12] INSTALLED NUT PLATE AT ZEE CHANNEL AS PER REF 737-700 SRM 51-40-02; [13] CERTIFIED NUT-PLATES INSTALLATION; [14] VERIFIED NUT PLATE INSTALLATION.; [15] REMOVED CORROSION AFT CARGO FLOOR 'Z' CHANEL AT STA 727A TO 847 S25L. FOUND OUT OF LIMITS; FABRICATED AS PER REF B737-700 SRM 51-40-05-0G-0.; [16] VERIFIED WORK ACCOMPLISHED

More about the Boeing 737-7H4