Service difficulty report · Floor Support · Boeing 7377CT

Difficulty date
May 27, 2021
Submitted
June 30, 2021
Operation
Air carrier
Aircraft
N7825A
Make and model
Boeing 7377CT
Aircraft serial
32750
Aircraft time
61,091 hours, 30,995 cycles
Part
Floor Support
Condition
Cracked
Location
Bs 927-947 Bl0
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

AFT WET AREA FLOOR. SUPPORT INTERCOSTAL APPEAR CRACK AND HAS ELONGATED HOLES BETWEEN STA 927 & 947 BL -0 ; / [01] PERFORMED HFEC INSP ON AFT WET AREA FLOOR SUPPORT INTERCOSTAL B/W STA 927 & 947 BL-0; IAW B737 NDT P6 51-00-00 PROC.23; CRACK CONFIRMED.<BR>TOOL USED : NORTEC 600 BC:166317 STANDARD:126; [02] REMOVED CHORD STA 927 TO STA 947 IAW 51-40-02-0G-0.; [03] LOCATED AND DRILLED NEW CHORD AS PER SRM 51-40-02-0G-0; [04] VERIFIED DRILLING OF SUPPORT INTER COSTAL . STEP 3. OK TO INSTALL<BR>NEW PART.; [05] INSTALLED NEW CHORD AT AFT WET AREA FLOOR STA 927-947 BL0 AS PER B737-700 SRM 51-40-02-0G-0.; [06] VERIFIED INSTALLATION OF NEW CHORD AT AFT WET AREA FLOOR STA 927-947 BL0 AS PER B737-700 SRM 51-40-02-0G-0.

More about the Boeing 737-7CT