Service difficulty report · Web · Boeing 7377CT

Difficulty date
May 27, 2021
Submitted
June 30, 2021
Operation
Air carrier
Aircraft
N7825A
Make and model
Boeing 7377CT
Aircraft serial
32750
Aircraft time
61,091 hours, 30,995 cycles
Part
Web
Condition
Corroded
Location
Bs 1016 Lbl4-15
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CORROSION ** AT AFT WET GALLERY SUPPORT FLOOR. WEB FORWARD OF AFT PRESSURE BULKHEAD STA 1016 LBL 4 TO LBL15 ; / [01] REMOVED CORROSION AT WEB STA 1016 AND LBL 4-16 AS PER B737-700 SRM 51-10-02-0G-0; NO SRM ALOWABLE DAMAGE EXIST; [02] REMOVED FASTENER (75%) AS PER B737-700 SRM 51-40-02-0G-0; [03] PARTIAL STEP; [04] REMOVED AFT WET GALLERY SUPPORT FLOOR WEB STA 1016 LBL 0 TO LBL 37.97 IAW B737-700 SRM 51-40-02-0G-0; [05] LOCATED AN DRILLED HOLE AT NEW FLOOR WEB AS PER B737-700 SRM 51-40-02-0G0; [06] LOCATED AND DRILLED HOLE AT NEW FLOOR WEB AS PER B737-700 SRM 51-40-02-0G0 . VERIFIED.; [07] OK TO INSTALL WEB ON AFT WET AREA.; [08] PARTIALLY INSTALLED NEW WEB P/N 147A5620-15 AS PER SRM 51-40-02-0G-0 AND DWG REF: 147A5600. APPLIED FAYING SURFACE SEALANT AT REQUIRED AREAS FOR WEB INSTALLATION AS SHOWN IN DWG 147A5600 & SOPM 20-50-19 STEP 9 A -C. SEALANT USED: BMS-595 (870C080). TIME MIXED AT 1700 HRS. TIME APPLIED 17:30.; [09] INSTALLED FASTENER 98% IAW B737-700 SRM 51-40-02-0G-0; PENDING CAP SEAL AND STRAP INSTALLATION (BL0)[14] REMOVED AND INSTALLED NEW WEB AT AFT WET GALLERY FLOOR AT STA 1016; BETWEEN LBL 0 - LBL 37.97 IAW B737-700 SRM 51-40-02-0G-0; SRM 51-40-05-0G-0 AND DWG: 147A5600; [15] INSTALLATION OF NEW WEB AT AFT WET GALLERY FLOOR AT STA 1016; BETWEEN LBL 0 - LBL 37.97 IAW B737-700 SRM 51-40-02-0G-0; SRM 51-40-05-0G-0 AND DWG: 147A5600.

More about the Boeing 737-7CT