What was found
CORROSION ON RAIL AT AFT CARGO BAY BS773 LBL8 WL157. UPDATED MEASUREMENTS; CORROSION ON RAIL PREVIOUSLY REPAIRED SECTION WAS FOUND TO OUT OF LIMITS DO TO NO LIMITS ARE LISTED IN THE SRM AND REQUIRES REPLACEMENT PER SRM 51-10-02-0G-0, BEGAN INSTALLING REPAIR CHANNEL PER SRM 53-00-53-2R-2. REPLACED CHANNEL PER SRM 53-00-53-2R-2. VERIFIED INSTALLATION OF ACB REPAIR CHANNEL, BS 773, LBL 8, WL 157 PER SRM 53-00-53-2R-2. FABRICATED REPAIR PART PER SRM 53-00-53-2R-2. VERIFIED ALL WORK COMPLETE THIS TASK.