What was found
CORROSION ON SIDEWALL SUPPORT AT AFT CARGO BAY BS787 2' BELOW S-24L WL160. ; / [01] EVALUATED CORROSION ON SIDEWALL SUPPORT; FOUND TO BE OUT OF LIMITS DUE TO NO LIMITS IN THE SRM AND REQUIRES REPLACEMENT PER SRM 51-10-02-0G-0; [02] VERIFIED EVALUATED CORROSION ON SIDEWALL SUPPORT; FOUND TO BE OUT OF LIMITS DUE TO NO LIMITS IN THE SRM AND REQUIRES REPLACEMENT PER SRM 51-10-02-0G-0; [03] REMOVED ACB SIDEWALL SUPPORT AT BS787+ 2' BELOW S-24L WL160 PER SRM 51-40-02-OG-0; [04] LOCATED AND DRILLED NEW ACB SIDEWALL SUPPORT ANGLE BS787; WL 157 TO WL 190. PER DWG 146A1262 AND SRM 51-40-05-0G-0. OK TO INSTALL.; [05] VERIFIED CORRECTIVE ACTION #3 AND 4; OK TO INSTALL; [06] INSTALLED NEW ACB SIDEWALL SUPPORT ANGLE BS787 FWD SIDE OF FRAME; WL 157 TO WL 190. PER DWG 146A1262 AND SRM 51-40-02-0G-0; [07] VERIFIED INSTALLATION OF NEW ACB SIDEWALL SUPPORT ANGLE BS787 FWD SIDE OF FRAME; WL 157 TO WL 190. PER DWG 146A1262 AND SRM 51-40-02-0G-0; [08] VERIFIED COMPLETE; [09] INSTALLED PART PER DRAWING 146A1262 AND SRM 51-40-02-0G-0; [10] CONFIRMED PART ENTRY AND DOCUMENTATION OF REPAIR COMPLETE; JOB COMPLETE