What was found
VAPOR BARRIER INTERIM REPAIR APPLIED PER SRM 51-10-10-1A-2 ; APPLIED INTERIM SEAL OVER THE CRACK AT LBL 11.9; 45 FROM PRESSURE DECK THA IN PER SRM 57 -10-10 PARAGRAPH 2.C.(4)/ALLOWABLE DAMAGE 2. VISUAL INSPECTION REQUIRED OF THE REPAIR AREA AT 1200 FLIGHT CYCKLE INTERVALS OR MORE FREQUENTLY. / [01] APPLIED INTERIM REPAIR PER SRM 57-10-10-1A-2 STEP 2 (C) 4. ACCOMPLISH VISUAL INSPECTION OF THE REPAIR AREA AT 1200 FLIGHT CYCLE INTERVALS OR MORE FREQUENTLY PER SRM 57-10-10-1A-2.; [02] APPLIED INTERIM REPAIR PER SRM 57-10-10-1A-2 STEP 2 (C) 4. ACCOMPLISH VISUAL INSPECTION OF THE REPAIR AREA AT 1200 FLIGHT CYCLE INTERVALS OR MORE FREQUENTLY PER SRM 57-10-10-1A-2.