Service difficulty report · Strap · Boeing 7377H4

Difficulty date
June 9, 2021
Submitted
July 22, 2021
Operation
Air carrier
Aircraft
N418WN
Make and model
Boeing 7377H4
Aircraft serial
29823
Aircraft time
65,911 hours, 38,694 cycles
Part
Strap
Condition
Corroded
Location
Bs 1006
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

SHEAR WEB TENSION STRAP CORRODED; BS1006; LBL8; WL208 ; / [01] CORROSION FOUND ON SHEAR WEB TENSION STRAP AT BS1006; LBL8; WL208; FOUND TO BE OUT OF LIMIT DUE TO NO LIMITS ON SRM PART WILL BI REPAIRED BY REPLACEMENT IAW SRM 51-10-02-OG-0 PAR. 9.C [06] FABRICATED SHEAR WEB TENSION STRAP B.S 1006 TO B.S 1030 LBL 8 WL208 FROM 7075T6#0.071SH C LOT #1375503-14 IAW SRM 51-40-05 AND DWG 147A5620. OK TREAT AND PRIMER; [07] VERIFIED FABRICATION AND OK TO CHEMICAL CONVERSION COAT AND PRIME.; [08] APPLIED ON SHEAR WEB TENSION STRAP CHEMICAL CONVERSION COATINGS AND PRIMER IAW SRM 52-20-01 OK TO INSTALL; [09] VERIFIED; APPLIED ON SHEAR WEB TENSION STRAP CHEMICAL CONVERSION COATINGS AND PRIMER IAW SRM 52-20-01 OK TO INSTALL; [10] INSTALLED SHEAR WEB TENSION STRAP B.S 1006 TO B.S 1030 LBL 8 WL 208 IAW SRM 51-40-02 AND DWG 147A5600; [11] VERIFIED INSTALLED SHEAR WEB TENSION STRAP B.S 1006 TO B.S 1030 LBL 8 WL 208 IAW SRM 51-40-02 AND DWG 147A5600; [12] CORRECTED REPAIR TYPE IN MEASUREMENTS; [13] CORRECTED REPAIR TYPE IN MEASUREMENTS; [14] ALL MAINTENANCE ITEMS COMPLETED; [15] REPAIR COMPLERTE; [16] REPAIR COMPLETE

More about the Boeing 737-7H4