What was found
CRACKED INTERCOSTAL AT B.S. 312-328; R.B.L. 33; W.L. 208.1. ; / [01] REMOVED INTERCOSTAL FROM BS 312-BS 328 RBL 33 WL208.1IAW SRM 51-40-02-0G-0; [02] CORRECTED MEASUREMENTS; [03] REMOVED INTERCOSTAL FROM BS 312-BS 328 RBL 33 WL208.1IAW SRM 51-40-02-0G-0; [04] LOCATED; DRILLED AND INSTALLED NEW INTERCOSTAL AT FLOOR STRUCTURE BETWEEN BS 312 TO BS 328 WL 208.1 RBL 33 PER SRM 51-40-05; SRM 51-40-02 AND DWG 141A5400; [05] VERIFIED INTERCOSTAL INSTALLATION; [06] JOB COMPLETE; [07] JOB COMPLETED; [08] TO CLARIFY STEP 5 S/O; INSTALLATION IS TO INCLUDE LOCATION AND DRILL OF PART IAW REFERENCES AND LOCATION LISTED ON STEP 4 S/O; [09] COMPLETED