Service difficulty report · Channel · Boeing 7377H4

Difficulty date
June 15, 2021
Submitted
July 22, 2021
Operation
Air carrier
Aircraft
N418WN
Make and model
Boeing 7377H4
Aircraft serial
29823
Aircraft time
65,911 hours, 38,694 cycles
Part
Channel
Condition
Corroded
Location
Bs 312-344
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CORROSION ON FORWARD ENTRY DOOR MOP SILL AT B.S. 312-344; L.B.L. 56; W.L. 208.1. ; / [01] REMOVED CORROSION FROM FORWARD ENTRY DOOR MOP SILL BS 312-BS 344 LBL 56 WL 208.1 IN AREA OF 2'X 1' ORIGINAL MATERIAL THICKNESS 0.090' IAW SRM 51-10-02-0G-0; [02] VERIFIED REMOVAL OF CORROSION FROM FORWARD ENTRY DOOR MOP SILL BS 312-BS 344 LBL 56 WL 208.1 IN AREA OF 2'X 1' ORIGINAL MATERIAL THICKNESS 0.090' IAW SRM 51-10-02-0G-0; [03] CORROSION WAS REMOVED ON ITEM 2 ABOVE FOUND .047' MATERIAL LOSS FROM AN ORIGINAL MATERIAL THICHNESS .090' (OR 52% MATERIAL REMOVED) WHICH IS OUT OF LIMITS IAW SRM 53-10-15-1A-1 ALLOWABLE DAMAGE 1. TOOL ID USED: ATS401; [04] VERIFIED ITEM 3. OUT OF LIMITS.; [05] REMOVED FED MOPSILL IAW SRM 51-40-02; [06] LOCATED AND DRILLED NEW FED MOP SILL IAW SRM 51-40-05 AND DWG #141A112 OK TO INSTALL; [07] VERIFIED LOCATED AND DRILLED NEW FED MOP SILL IAW SRM 51-40-05 AND DWG #141A112 OK TO INSTALL GIVEN; [08] INSTALLED FED MOP SILL BETWEEN BS 270 TO BS 360 LBL 56 WL 208.1 PER SRM 51-40-02 DWG 141A8110; [09] ALL ITEM ARE COMPLETE; [10] PART INFO USAGED; [11] VERIFIED INSTALLATION FED MOP SILL BETWEEN BS 270 TO BS 360 LBL 56 WL 208.1 PER SRM 51-40-02 DWG 141A8110; [12] WORK SCOPE COMPLETE

More about the Boeing 737-7H4