What was found
FLOOR SUPPORT BS 540; RBL 25 - BL 0; WL 208 CRACKED AT I/B FASTENER HOLE ; / [01] REMOVED AND INSTALLED FLOOR SUPPORT AT BS 540 RBL 25 TO BL 0 WL 208 PER SRM 51-40-02 AND BOEING DWG 143A0060. FLOOR SUPPORT STILL REQUIRES MATCH DRILL OF FLOOR PANEL FASTENER HOLE.; [02] VERIFIED; [03] VERIFIED CORRECTIVE ACTION ITEMS 1 AND 2 REMOVAL AND INSTALLATION OF FLOOR SUPPORT AT BS 540 RBL 25 TO BL 0 WL 208 PER SRM 51-40-02 AND BOEING DWG 143A0060. <BR>**FLOOR SUPPORT STILL REQUIRES MATCH DRILL OF FLOOR PANEL FASTENER HOLE.**; [04] LOCATED AND DRILLED FLOOR PANEL HOLES IAW SRM 51-40-05-OG-0; [05] VERIFIED FLOOR PANEL HOLES IN THE NEW FLOOR SUPPORTS PER SRM 51-40-05-OG-0