What was found
L/H HORIZONTAL STABILIZER L/E FAIRING CRACKED AT RIB # 4 END EDGE MKD DOT ; / [01] REMOVED RIB #4 FROM L/H HORIZONTAL STABILIZER L/E FAIRING PER B737-700 SRM 51-40-02-0G-0; [02] LOCATED AND DRILLED NEW RIB P/N 186A1352-7 P/O# 1684224 PER B737-700 SRM51-40-05-0G-0; [03] VERIFIED; [04] OK TO INSTALL; [05] OK TO INSTALL NEW RIB; [06] MIXED BMS5-95 SEALANT AT 06:50AM; 06/25/2021. SQUEEZE OUT TIME BY 02:50A; 06/26/2021; [07] INSTALLED NEW RIB #4 AT L/H HORIZONTAL STABILIZER PER B737-700 SRM51-40-02-0G-0 AND DRAWING # 186A1001; [08] REMOVED AND REPLACED RIB #4 FROM L/H HORIZONTAL STABILIZER L/E FAIRRIING PER REFERENCE B737-700 SRM 51-40-02-0G-0 SRM 51-40-05-0G-0 AND DRAWING # 186A1001; [09] VERIFIED STEPS 6; 7 & 8