Service difficulty report · Channel · Boeing 7377H4

Difficulty date
June 24, 2021
Submitted
August 4, 2021
Operation
Air carrier
Aircraft
N940WN
Make and model
Boeing 7377H4
Aircraft serial
36900
Aircraft time
39,596 hours, 24,067 cycles
Part
Channel
Condition
Corroded
Location
Bs 964-986
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CORROSION ON AFT ENTRY DOOR MOP SILL BS 964-986 LBL 52 WL 208. ; / [01] REMOVED CORROSION ON AFT ENTRY DOOR MOPSILL STA 964-986; LBL 52; WL 208. MAX MATERIAL REMOVED WAS .015' 1' BY 1' FROM .080'. OUT OF LIMITS PER SRM 53-70-15-01-1; SRM 53-70-15-1A-1; SRM 51-10-02-0G-0.; [02] VERIFIED REMOVED CORROSION ON AFT ENTRY DOOR MOPSILL STA 964-986; LBL 52; WL 208. MAX MATERIAL REMOVED WAS .015' 1' BY 1' FROM .080'. OUT OF LIMITS PER SRM 53-70-15-01-1; SRM 53-70-15-1A-1; SRM 51-10-02-0G-0.; [03] REMOVED AFT ENTRY DOOR MOP SILL IAW SRM 51-40-02-0G-0.; [04] LOCATED AND DRILLED AND COUNTERSUNK NEW AFT ENTRY DOOR MOPSILL PER SRM 51-40-02-0G-0; SRM 51-40-05-0G-0; SRM 51-40-08-0G-0; DWG#147A8501; REV B. OK TO INSTALL.; [05] VERIFIED CORRECTIVE ACTION ITEMS 3 AND 4; OK TO INSTALL; [06] ACCOMPLISHED PARTIAL INSTALLATION OF AFT ENTRY DOOR MOPSIL 100% TEMP OR PERMANENT FASTENERS INSTALLED WITHIN SEALANT SQUEEZE OUT TIME; [07] VERIFIED 100% TEMP OR PERMANENT FASTENERS INSTALLED WITHIN SEALANT SQUEEZE OUT TIME; [08] COMPLETED INSTALLATION OF NEW AFT ENTRY DOOR MOPSILL PER SRM 51-40-02-0G-0 AND BOEING DWG 147A8501.; [09] VERIFIED INSTALLATION OF THE AED MOP SILL PER DWG 147A8501; [10] COMPLETE

More about the Boeing 737-7H4