What was found
CRACK ON DOUBLER ON FWD SIDE OF R/H BS 663 VAPOR BARRIER AT RBL 25 WL 146 ; / [01] RECEIVED FROM OSS NEW DOUBLER VERIFIED HEAT TREATMENT AND FABRICATION IAW DWG 111A1511-28 AND BAC 5602 MAT. USED 2024 T42 0.040' LOT#1453744-1; LOCATED AND DRILLED;APPLIED CHEMICAL CONVERSION COATING AND PRIMER IAW SRM 51-40-05-0G-0 AND DWG 111A1000.; [02] OK TO INSTALL.; [03] VERIFIED CORRECTIVE ACTION ITEM 1. SEE PO NO. 828953-SWA FOR FABRICATION AND HEAT TREAT.<BR><BR>OK TO INSTALL; [04] INSTALLED 100% OF TEMPORARY FASTENERS ON DOUBLER REPLACEMENT AREA BEFORE SQUEEZE OUT TIME EXPIRE SEALANT BMS 5-95 C-20 MIXED 17:50 HRS 02/JUL/21; TIME EXPIRE 03/JUL/21 13:50 HRS. IAW SOPM 20-50-19.; [05] VERIFIED DOUBLER AREA FASTENERS BEFORE SQUEEZE OUT; [06] INSTALLED DOUBLER AT BS 663 RBL 6-25 IAW SRM 51-40-02-0G-0 AND DWG 111A1001;111A1000.; [07] RII VERIFIED INSTALLED; [08] ALL STEPS COMPLETED FOR DOUBLER ON FWD SIDE RH BS 663 VAPOR BARRIER RBL25 WL146.; [09] VERIFIED RII STEPS COMPLETE; [10] VERIFIED ALL STEPS COMPLETE.