What was found
CRACK ON DOUBLER ON FWD SIDE OF L/H BS663 VAPOR BARRIER AT LBL25 WL146 ; / [01] REMOVED DOUBLER ON FWD SIDE OF VAPOR BARRIER BS 663 LBL6-31 IAW SRM 51-40-02-0G-0.; [02] INSTALLED 100% TEMPORARY FASTENERS ON AFT SIDE OF DOUBLER REPAIR AREA (VERTICAL STIFFENERS BS 663 LBL6;25-31)BEFORE SQUEEZE OUT TIME EXPIRED APPLIED BMS5-95 C-20 JUL-05-2021 UTC 14:00 HRS EXPIRATION TIME JUL-06-2021 UTC 10:HRS. IAW SOPM 20-50-19.; [03] VERIFIED INSTALLED 100% TEMPORARY FASTENERS ON AFT SIDE OF DOUBLER REPAIR AREA (VERTICAL STIFFENERS BS 663 LBL6;25-31)BEFORE SQUEEZE OUT TIME EXPIRED APPLIED BMS5-95 C-20 JUL-05-2021 UTC 14:00 HRS EXPIRATION TIME JUL-06-2021 UTC 10:HRS. IAW SOPM 20-50-19.; [04] COMFORMED NEW DOUBLER AND VERIFIED HEAT TREATMENT FABRICATION MAT. USED 2024 T42 CLAD 0.040' LOT#1391616-1 R.O 829384-SWA; LOCATED;DRILLED APPLIED CHEMICAL CONVERSION COATING AND PRIMER IAW .BAC 5602;DWG 111A1511;111A1000;11A1001 AND SRM 51-40-05-0G-0. OK TO INSTALL.; [05] INSTALLED NEW DOUBLER AT VAPOR BARRIER BS663 LBL6-31 IAW DWG 111A1511;111A1000;11A1001 AND SRM 51-40-02-0G-0.; [06] VERIFIED FABRICATION; LOCATE-AND-DRILL AND CHEM CONVERSION COATING AND PRIMER; VERIFIED INSTALLATION OF NEW DOUBLER AT VAPOR BARRIER BS663 LBL6-31 IAW DWG 111A1511;111A1000;11A1001 AND SRM 51-40-02-0G-0; [07] VERIFIED ALL WORK COMPLETED THIS TASK