What was found
FCB GUSSET CRACKED AT BS 500D; STR-22L (MARKED) ; / [01] EVALUATED DAMAGE FOR GUSSET CRACKED AT B/S 550D STR 22L AND NOT FOUND ALLOWABLE DAMAGE LIMITS ON SRM MUST BE REPLACED IAW SRM 51-10-02 PARAGRAPH 9; [02] REMOVED GUSSET AT B/S 550D STR 22L IAW SRM 51-40-02; [03] VERIFIED; [04] VERIFIED STEPS 1 AND 2 ACCOMPLISHED PER SRM.; [05] RECEIVED FABRICATED GUSSET ITEM HFAB53-GU-011PO # 829682. FABRICATED AND HEAT TREATED PER DWG 143A9483 PL SHT-2; -13 GUSSET. ALODINED PER DWS 143A9483 PL. OK TO PRIME; [06] VERIFIED CERTIFICATION FOR RECEIVED HFAB53-GU-011PO # 829682 AND HEAT TREAT. VERIFIED CHEMICAL CONVERSION DWS 143A9483 PL. OK TO PRIME; [07] APPLIED PRIMER IN NEW GUSSET IAW. SRM 51-20-01; [08] LOCATED AND DRILLED FCB NEW GUSSET AT BS 500D;STR-22 IAW SRM 51-40-05.OK TO INSTALL.; [09] VERIFIED; [10] VERIFIED STEPS 7 AND 8 ACCOMPLISHED; OK TO INSTALL; [11] INSTALLED FCB NEW GUSSET BS 500D;STR-22L IAW SRM 51-40-02 AND DWG 143A7902 REV:E.; [12] VERIFIED; [13] RII INSPECTED; VERIFIED INSTALLATION GOOD; [14] VERIFIED; CONFIRMED JOB COMPLETE